Spring has sprung and Bichon and I love to smell the flowers together!
Friday, April 6, 2007
Tuesday, April 3, 2007
Tile is going down!
The tile has been delivered, and the concrete-backerboard is being put down. Today we picked the tile for the walk-in shower. After the tile goes down, the trim work will begin. I set the camera on a timer, and for the 2nd picture, the timer was set at a really fast speed. When I heard I wasn't going to make it, I did a toe-touch instead. David and I got a good laugh out of this! : )
Saturday, March 31, 2007
Fish-Fry at the McCash's
Friday, March 23, 2007
Sheetrock is in!!
While we were on vacation, the sheetrock, back siding, and facia went in. We can now see the height of the ceilings, the archways, and the feel the size of the rooms. We are having bullnozed corners, and those are being added to the sheetrock. We have picked our brick and rock for the front- natchez trace brick and tahoe ledge stone. We can't wait to see what will happen next!
Spring break 2007
Spring Break trip 2007
Fifteen of us left Arkansas, and stayed a week in Southfork, Colorado. We rented a three story log cabin and skied together for four days. Our cabin sat on the banks of the Rio Grande- it was amazing! We spent a day in Durango and Pagosa Springs shopping. We took our neice and nephew, Amber and Greg, with us. We had a blast! : )
Wednesday, March 14, 2007
Babies!
Subscribe to:
Posts (Atom)